ACT
537 OFFICIAL PLAN REVISION
special
study
TYLERSPORT
Area
FOR
finalized July 2006
adopted august 17, 2006
PREPARED BY
BCM
Engineers
PROJECT No: 57.24274.0300
and
Chambers
Associates Inc.
PROJECT No: 139-042
TABLE OF CONTENTS
EXECUTIVE SUMMARY 5
1.0 INTRODUCTION 6
1.1 Background 6
1.2 Previous Wastewater Planning 6
2.0 PHYSICAL AND DEMOGRAPHIC ANALYSIS 8
2.1 Planning Area 8
2.2 Physical Characteristics 8
2.3 Soils Analysis 8
2.4 Geologic Features 10
2.5 Topography 11
2.6 Potable Water Supplies 11
2.7 Wetlands/Floodplain 11
3.0 EXISTING SEWAGE FACILITIES 19
3.1 Existing Facilities 19
3.2 Proposed Facilities 19
3.3 Sewage Disposal Needs Identification 19
4.0 FUTURE GROWTH AND DEVELOPMENT 28
4.1 Municipal & County Planning Documents 28
4.2 Existing Development & Growth Areas 30
4.3 Zoning Regulations 31
4.4 Population Projection 33
4.5 Zoning & Subdivision Regulations 33
4.6 Projected Sewage Needs 34
5.0 IDENTIFICATION OF ALTERNATIVES 38
5.1 Wastewater Disposal Alternatives 38
5.2 Wastewater Collection Alternatives 38
5.3 Identified Alternatives 38
TABLE OF CONTENTS (Cont.)
6.0 EVALUATION OF ALTERNATIVES 39
6.4 Alternative 4 – Connection to Regional WWTP 43
6.5 Cost Analysis 44
7.0 INSTITUTIONAL EVALUATION 57
8.0 SELECTED ALTERNATIVE 58
8.1 Structural Alternative 58
8.2 Institutional Alternative 59
8.3 Consistency Evaluation 59
9.0 IMPLEMENTATION EVALUATION 61
TABLES
Table 3-1 OLDS Survey Results Summary 21 - 25
Table 6-1A Capital Costs – Alternative 3, Option 1 49
Table 6-1B Capital Costs – Alternative 3, Option 2 50
Table 6-2A Capital Costs - Alternative 4, Option 1 51
Table 6-2B Capital Costs - Alternative 4, Option 2 52
Table 6-3 Operation and Maintenance Cost Summary 53
Table 6-4 Present Worth Cost Summary 54
Table 6-5 Development of Annual EDU Charges – Alternative 3 55
Table 6-6 Development of Annual EDU Charges – Alternative 4 56
TABLE OF CONTENTS (Cont.)
FIGURES
Figure 1-1 Location Map 7
Figure 2-1 Study Area Map 12
Figure 2-2 Hydrology 13
Figure 2-3 Soils Map 14
Figure 2-4 Hydric & Alluvial Soils Map 15
Figure 2-5 Agricultural Soils Map 16
Figure 2-6 Steep Slopes Map 17
Figure 2-7 Geology 18
Figure 3-1 Proposed Sewage Facilities 26
Figure 3-2 OLDS Survey Results Map 27
Figure 4-1
Figure 4-2 Growth & Preservation Plan 36
Figure 4-3
Figure 6-1 Alternative 3, Option 1 Facilities Layout 47
Figure 6-2 Alternative 4, Option 1 Facilities Layout 48
Figure 9-1 Implementation Schedule 62
APPENDIX A OLDS Survey
Data Sheets
appendix B WWTP Design Data
appendix c Applicable Correspondence
Appendix d Planning Agency Comments And
Municipal Response
Appendix e Proof of Publication of Public
Notice
Appendix f Public Comments and Municipal
Response
appendix g Resolution of Adoption by the
Township
appendix h Checklist
APPENDIX I
APPENDIX J Draft Grinder Pump Ordinance
APPENDIX K Draft
Inter-Municipal Agreement
EXHIBITS
EXHIBIT 1 Developer Site & Off-site Plans
An Act 537 Special Study Plan has been developed for
the Tylersport area of
The Plan was initiated following submission of plans by a developer to construct a residential development in the area, adjacent to Route 563 and the Northeast Extension of the PA Turnpike. The developer planned to serve the proposed homeowners with a sewage collection system and package treatment plant.
The Montgomery County Health Department has reported a history of problems with the on-lot disposal systems in Tylersport and a Needs Analysis prepared using preliminary site investigations and homeowner interviews, revealed a high rate of actual and suspected malfunctioning systems. Therefore, the Plan takes the opportunity to evaluate the option of constructing a central sewage collection system along Route 563 and Allentown Roads in Tylersport, transporting the waste to the developments treatment plant.
Following the required review of the past planning
efforts in the area, the physical characteristics and soil properties, the Plan
evaluates various options and then recommends the construction of a low
pressure collection sewer system in Tylersport, including grinder pumps at each
existing property. The sewage would be
conveyed through gravity sewers to a pump station constructed by a developer on
his site. The raw sewage will be pumped
south on
Financing for the Township portion of the project
(collection system in Tylersport) will be funded by a low interest PENNVEST
loan. The capital cost of all other
facilities required will be borne by the developer. The estimated connection fee for each
existing equivalent dwelling unit (EDU) will be $4,500. At the time of connection, $4,207 of this
will be transferred to
A developer has proposed to build a number of homes adjacent to Tylersport and is providing sewage facilities to meet the disposal needs of their property. Due to a history of complaints to the Montgomery County Health Department about the condition of the existing on-lot disposal systems in the Tylersport area, the developer offered the Township the chance to connect a central collection system into their facilities.
Prior to conducting a full Act 537 Plan for the entire Township, it was agreed with the Pennsylvania Department of Environmental Protection (PADEP), to prepare this Special Study for the Tylersport Area. A Scope of Work was submitted to PADEP on July 29, 2003 and subsequently approved on September 11, 2003.
There has been no specific wastewater planning conducted for
A Montgomery County Sewage Facilities Plan, dated 1972,
prepared by the Montgomery County Planning Commission, in its discussion of the
East Branch Perkiomen Creek Watershed, stated that “a new municipal package
plant is recommended to serve the Tylersport area of
Figure 1-1 Location Map (See Hardcopy at Township Office)
Figure 2-1 identifies the boundaries of
Physical characteristics such as streams, lakes,
impoundments, and natural conveyance channels are shown on the “Hydrology Map”
of the Comprehensive Plan Update, as shown on Figure 2-2.
The Tylersport Study Area is almost equally divided between
the
Tylersport contains a variety of residential dwelling types
including single family detached, twin, duplex and apartment units. Tylersport is considered
The soils of
A review of
1. Reaville-Penn-Klinesville association: Shallow to moderately deep, well-drained to somewhat poorly drained soils underlain by shale; soils on rolling uplands.
2. Lehigh-Brecknock-Croton association: Moderately deep and deep, poorly drained to well-drained soils underlain by metamorphosed shale; on uplands.
3. Neshaminy-Mount Lucas-Watchung association: Deep, well-drained to poorly drained soils underlain by diabase; on hills and ridges.
4. Abbottstown-Readington-Croton association: Deep, moderately well drained to poorly drained soils underlain by shale and sandstone; on undulating uplands.
The Comprehensive Plan identifies hydric and alluvial soils
(Figure 2-4), which generally have a seasonally high water table, as defined
and mapped by the USDA Soil Conservation Service in their Montgomery County
soil survey. These soils are
environmentally sensitive and may represent varying degrees of physical
limitations of development. Figure 2-5 presents the agriculture soils within
The soil series mapped in
Group 5 - Moderate Deep, Well Drained Soils with probable Percolation Rates on One Inch of Water in 15-30 Minutes. Brecknock Soils Group
Group 7 – Moderately Deep, Well Drain Soils with Probable Percolation Rates of One Inch of Water in 30 to 45 Minutes. Penn Soils
Group 8 – Deep, Well Drained Soils with Probable Percolation Rates of One Inch of Water in 45-60 Minutes. Neshaminy Soil
Group 12 – Well Drained Soils that are Shallow or Very Shallow to Bedrock.
Klinesville Soils
Group 14 –
Moderately Well Drained Soils on
Group 15 –
Some What Poorly, Poorly and Very Poorly Drained Soils on
Internal forces active during the Triassic Period of
geologic time (150-180 million years ago) have manifested themselves in the
present geologic formations in
The Lockatong formation is found in two section of
The Lockatong formation along
The Lockatong formation is a poor aquifer because of its low porosity and permeability. Average well yields run from 4-40 gallons per minute and the water produced from these yields is moderately to highly mineralized and hard. In times of heavy precipitation, heavy runoff may occur because of the lower permeability of the thin soils atop this formation, and consequent inadequate absorption capacity.
The
In the western section of the township from Ridge Valley
Creek to the western township border next to the
There is no data available indicating a potential Nitrate-Nitrogen Pollution.
All water needs within the Township are currently met by on-site wells. There is, of course, a direct correlation between potential on-site sewer problems and contaminated drinking water. It is important to note that simply “sewering” an area to remove contamination will not avoid the need for public water supply. Public water is often needed in a “sewered” area because all effluent will be transported and disposed of in areas other than where the water was withdrawn. If water is withdrawn from these areas and not allowed to recharge back into the underlying aquifers, the groundwater supply can be depleted.
The Township’s desire in the case of both water and sewer service is to enact sound plans for the provision of these facilities. The Township’s overall Plan will be driven by a respect for the natural features that so define the community. In the Tylersport Study Area, however, the many small lots and lack of suitable soil for remediation of failed systems, is sufficient to encourage the use of public water supply in the area, where it is both feasible and cost-effective.
Figure 2-4 is a map showing hydric soils in
Figure 2-1 Study Area Map (See Hardcopy at Township Office)
Figure 2-2 Hydrology (See Hardcopy at Township Office)
Figure 2-3 Soils Map (See Hardcopy at Township Office)
Figure 2-4 Hydric & Alluvial Soils Map (See Hardcopy at Township Office)
Figure 2-5 Agricultural Soils Map (See Hardcopy at Township Office)
Figure 2-6 Steep Slopes Map (See Hardcopy at Township Office)
Figure 2-7 Geology (See Hardcopy at Township Office)
This section documents and briefly describes the existing and proposed wastewater facilities located in or available to serve the Planning Area.
There are no existing public sewage facilities in the Tylersport area. All of the developed properties are served by individual on-lot disposal systems (OLDS). The type and condition of these units will be discussed in depth in Section 3.3
The only facilities that are currently planned in the study
area are a central collection system to serve two developments that have been
proposed by WB Homes and pumping and conveyance facilities to transfer the flow
to
The Montgomery County Health Department (MCHD) administers
inspection and permitting of OLDS within
Subsequent visits to the Departments office in
A qualified inspection company, following the guidelines developed by PADEP, conducted a door-to-door survey of the properties in the Planning Area. The survey was conducted January 19, February 27, February 28 and March 6, 2004.
The PADEP guidance document sample survey sheet questionnaire, with a list of questions to be asked, was used during the survey.
A total of 92 properties with OLDS were counted in the study area, representing approximately 104 equivalent dwelling units (EDU’s). Of these properties 54 (59%) were surveyed. This exceeds the PADEP minimum sample size of 35 percent OLDS sampling required for a project area with 51 to 100 OLDS. Due to the high sampling percentage, the survey should be considered a very reliable indicator of the status of the OLDS in the project area.
In accordance with the PADEP guidance, the surveyed OLDS were placed into one of the following four categories: (1) confirmed malfunction, (2) suspected malfunction, (3) potential malfunction or, (4) no malfunction.
Of the 54 OLDS that were field surveyed, the systems were categorized as follows:
· Malfunctions - 29 properties or 54 %
· Suspected malfunctions – 10 properties or 19%
· Potential malfunctions - 12 or 22%
· No malfunctions - 3 or 5%
A summary of the results of the survey is shown on Table 3-1
and Figure 3-2. Those properties that
were not field surveyed, but whose soils are mapped as unsuitable, are also
noted on the map. The survey data sheets
are included in Appendix A.
|
Location/ Site Use |
No. Residents / Baths |
|
Type System |
Age of System (years) |
Last Pumping of System |
Previous Repairs |
System Condition* |
Description of Malfunction |
|
4 Residential |
2/3 |
1.2 |
In
ground bed |
30+ |
Jan. 2004 |
None |
M |
Gray
water to storm drain/ not permitted/ poor soils |
|
5 Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
S |
Abandoned
apartment building/ poor soils |
|
9 Residential |
4/3 |
0.5 |
In
ground bed |
15 |
Fall 2003 |
line repaired (1985) - no permit |
M |
Gray
water to ditch/ past repair/ poor soil/ not permitted |
|
10 Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
M |
Gray
water to ditch/ poor soil |
|
12 Residential |
4/2 |
0.33 |
In
ground bed |
20+ |
2003 |
None |
S |
Gray
water to pit/ odors/ green grass/ poor soil |
|
13 Residential |
2/3 |
0.29 |
In
ground trench |
NA |
Summer 2003 |
NA |
P |
Poor
soil/ sluggish drains |
|
15 Residential |
7/5 |
1 |
Elevated
sand mound (permitted) |
4 |
Never |
None |
P |
Poor
soil/ surface water on lower part of ESM/ replaces cesspool |
|
18 Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
M |
Gray
water to ditch/ poor soil |
|
22 Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
M |
Gray
water to ditch/ poor soil |
|
25 Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
M |
Gray
water to ditch/ poor soil |
TABLE
3-1 (cont.)
|
28 Residential |
5/3 |
2 |
IRSIS (permitted) |
15 |
NA |
NA |
C |
No
malfunction |
|
29 Residential |
(2 units) |
NA |
In
ground |
NA |
NA |
NA |
M |
Sewage
draining to adjacent property |
|
33 Residential |
(4 units) |
NA |
In
ground |
NA |
NA |
NA |
M |
Gray
water drains to street/ Sewage drains to adjacent property |
|
39 Residential |
3/2 |
14 |
Cess
pool |
55 |
1998 |
line repaired (1998) - no permit |
M |
Gray
water to ditch/ old, unpermitted system/ poor soil |
|
44 Residential |
3/3 |
7.7 |
In
ground trench (permitted) |
40 |
2003 |
None |
M |
Gray
& Black water discharge to surface/ poor soil/ ponding water, soggy
areas, green grass |
|
45 Residential |
4/2 |
1.125 |
Elevated
sand mound (permitted) |
15 |
2002 |
None |
M |
Effluent
leaking from berm/ green grass/ spongy areas/ poor soil |
|
51 Residential |
4/3 |
2.875 |
In
ground trench |
55 |
Summer 2003 |
None |
M |
Gray
water discharge to surface/ poor soil/ old, unpermitted |
|
52 Residential |
2/3 |
4 |
In
ground bed |
19+ |
2-28-04 |
None |
P |
Poor
soil/ possibly unpermitted |
|
Church |
NA |
NA |
Portable
toilets |
NA |
NA |
None |
S |
No
permanent system/ potential pit system |
|
3 N. Residential/
Commercial |
1/3 |
0.25 |
In
ground bed |
50+ |
2002 |
Tank repaired- not permitted |
P |
Poor
soil/ unpermitted repair/ old system |
|
7 N. Residential |
4/NA |
1 |
Septic
Tank |
20+ |
NA |
None |
P |
Poor
soil/ spongy areas/ poor drainage |
|
8 N. Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
P |
In
ground system with poor soils |
TABLE 3-1 (cont.)
|
11 N. Residential |
4/NA |
0.33 |
In
ground bed/trench |
15+ |
2001 |
None |
S |
Green
grass/ poor soil |
|
13 N. Residential |
3/3 |
0.75 |
In
ground trench |
25+ |
Dec. 2003 |
Replaced line (2000) - not permitted |
P |
Green
grass/ poor soil/ unpermitted repair |
|
14 N. Commercial |
4/7 |
0.9 |
In
ground trench |
40 |
2003 |
Repaired line (2000) - not permitted |
S |
No
baffles in tank/ poor soils/ green grass/ unpermitted repair |
|
24 N. Residential |
1/2 |
0.33 |
Holding
tank |
2 |
Feb. 2004 |
None |
M |
Gray
water pumped to surface/ poor soils |
|
25 N. Residential |
4/3 |
0.2 |
In
ground bed |
50+ |
1994 |
None |
M |
Gray
water drains to street/ poor soil |
|
27 N. Residential |
5/NA |
0.5 |
Septic
Tank |
15 |
2002 |
None |
P |
Pre-regulatory
in ground/ poor soil |
|
29 N. Residential |
3/NA |
2.5 |
Septic
Tank |
4+ |
2002 |
None |
M |
System
leaks to surface/ poor soil |
|
30 N. Residential |
2/3 |
7.4 |
In
ground trench/ seepage pit |
25+ |
2003 |
Replaced line (1996) - not permitted |
M |
Gray
water seepage from front of house/ poor soil/ unpermitted repair/ spongy
areas |
|
40 N. Residential |
NA |
NA |
In
ground |
NA |
NA |
NA |
P |
small
lot with in ground system/ poor soils |
|
43 N. Residential
(2 buildings) |
3/4 |
7 |
Septic
tank |
#1 - 55 #2 - 45 |
1994 |
None |
M |
Sewage
pumped to surface into open ditch/ poor soils/ grey water to ditch/ spongy
areas |
|
44 N. Residential |
2/4 |
1.7 |
In
ground trench |
54 |
2000 |
None |
M |
Gray
water drains to yard/ poor soil/ old system/ green grass/ ponding water/
spongy areas |
TABLE 3-1 (cont.)
|
54 N. Residential |
5/4 |
0.75 |
Elevated
sand mound (permitted) |
10 |
2002 |
None |
M |
Gray
water drains to ditch/ poor soil |
|
64
N. |
3/3 |
0.9 |
Elevated
sand mound (permitted) |
15 |
2001 |
None |
C |
No
malfunction |
|
Fire Company Commercial |
(200 -
capacity) |
15 |
Elevated
sand mound (permitted) |
17 |
Fall 2003 |
None |
C |
No
malfunction |
|
Commercial |
(1.6EDUs) |
2.5 |
Elevated
sand mound (permitted) |
25+ |
2003 |
Repaired line (1990+) |
S |
Ponding
water/ water backing into restaurant/ poor soils |
|
Residential |
9/7 |
1.33 |
In
ground bed/trench |
30+ |
3-4-04 |
>D= |
M |
Surface
discharge of effluent/green grass/ odor/ sluggish drains/ system overflow/
spongy areas/ water ponding |
|
Residential |
3/4 |
1 |
Elevated
sand mound (permitted) |
28 |
2000 |
None |
M |
Sewage
outbreak top of berm/ poor soil/ green grass/ odor/ spongy area |
|
Residential/
Commercial |
(1.3EDUs) |
4 |
In
ground trench (2 systems) |
kennel-26 house-NA |
2003 |
None |
S |
Poor
soils/ green grass/ spongy area |
|
Residential |
2/4 |
25 |
In
ground trench |
30 |
NA |
None |
M |
Poor
soils/ old system/ Gray water piped to field |
|
Residential |
2/3 |
0.875 |
In
ground trench |
45 |
2002 |
None |
M |
Poor
soils/ sewage to surface |
|
Residential/
Commercial |
(2.15EDUs) |
11 |
In
ground trench |
52 |
Fall 2003 |
None |
S |
Old,
unpermitted system/ poor soil |
TABLE 3-1 (cont.)
|
Residential |
NA/3 |
1 |
In
ground trench |
67+ |
Fall 2003 |
None |
M |
Gray
water drains to ditch/ poor soil |
|
Residential |
(2EDUs) |
0.75 |
In
ground trench |
30+ |
Nov. 2003 |
None |
S |
Old,
unpermitted system/ poor soil |
|
Residential |
3/3 |
0.5 |
In
ground trench |
25+ |
2001 |
Replaced drain field (1994)-no permit |
M |
Ponding
water over system/ poor soils/ gray water enters storm sewer |
|
Commercial |
NA |
NA |
In
ground |
NA |
NA |
NA |
M |
Effluent
seepage within road right-of-way/ poor soils |
|
Commercial |
(0.42EDUs) |
3 |
In
ground trench |
17 |
2001 |
Replaced tank, line, drain field (2001)-permitted |
C |
No
malfunction |
|
Residential |
2/2 |
0.25 |
In
ground trench |
NA |
1999/ 2000 |
Replaced drain field/ Repaired tank (1994) |
M |
Surface
discharge/ poor soil/ green grass |
|
Residential/
Commercial |
1/NA |
11 |
In
ground trench |
20+ |
2001 |
Repaired drain field (1985) permitted |
P |
Poor
soil/ older system |
|
Residential |
3/3 |
1 |
In
ground trench/bed |
NA |
2002 |
NA |
M |
Effluent
drains to road/ poor soil |
|
Residential |
2/NA |
1.33 |
In
ground trench |
30+ |
1999 |
Replaced tank, drain field (1989) permitted |
M |
Surface
discharge/ poor soil/ green grass |
|
Commercial |
(5EDUs) |
3 |
In
ground bed (permitted) |
NA |
2001 |
Replaced tank, line, drain field (1984) permitted |
P |
Existing
system is a replacement system/ poor soil/ driveway over system |
* M - Confirmed malfunction; S - Suspected malfunction; P - Potential malfunction; C - No malfunction
Figure 3-1 Proposed Sewage Facilities (See Hardcopy at Township Office)
Figure 3-2 OLDS Survey Results Map (See Hardcopy at Township Office)
The
1997
The Land Use chapter of this report is the cornerstone of the Indian Valley Regional Comprehensive Plan. This Land Use Plan will guide how the six municipalities implement land use policies. Understanding existing land use patterns, and properly integrating future land use as part of one unified plan will result in a more efficient land use pattern that preserves open space, revitalizes business centers and preserves the small town character that is so important to residents. The Land Use Plan designates appropriate areas for new growth and directs revitalization, new development and infrastructure improvements into those areas. Outside of the designated growth areas, the primary land use objective is preservation of the region’s rural landscape and its natural and cultural resources. Figure 4-1 is a copy of the Indian Valley Regional Comprehensive Plan, Land Use in the Tylersport Study Area.
The
Montgomery County Planning Commission is in the process of preparing a
Comprehensive Plan for
The
Zoning Ordinance of
The
current Subdivision and Land Development Regulations are known as the
The
Zoning and Subdivision Ordinances do not control lot size predicated on sewage
disposal methods. Figure 4-4 is a draft
copy of the proposed
Article
XII of the
The
Subdivision and Land Development Ordinance of
Section 510
E. Stormwater Retention
1. Stormwater retention facilities will be required if one of the following conditions are met:
a. Runoff from the development would exceed the capacity of downstream stormwater facilities.
b. Runoff from the development would increase the peak runoff from the existing conditions. One single family dwelling not requiring subdivision is exempt from this requirement.
c. Runoff from the proposed parking facility or building would increase the peak runoff from the existing condition.
2. The design criteria for the stormwater retention facility shall be agreed upon by the Township Engineer. Developers are encouraged to investigate all measures to reduce and retain water. All reasonable methods will be considered.
Municipal Separate Storm Sewer System
(MS4)
As required by the Pennsylvania Department of Environmental
Protection,
A map of
Within
the
This section discusses the residential and non-residential zoning designations.
A. Residential
The current
RESIDENTIAL ZONING SUMMARY
District Primary
Use Minimum
RC Single family detached dwelling, natural open 2 Acres
space uses, game farm, agriculture activities (by (performance
special exception: single family detached dwelling zoning)
converted for multiple occupancy) (by conditional
use - day camp, kennel, parks and recreation, forestry)
RA Single family detached dwelling, natural open 2 Acres
space game farm, parks and recreation, agricultural (performance
(by special exception - single family detached dwelling zoning)
converted for multiple occupancy)
RR Single family detached agricultural (by special 2 Acres
exception - single family detached dwelling converted
for multiple occupancy, educational use,
municipal use, club, community center,
golf course, riding academy, fire station)
(conditional use: cemetery)
MF Parks, apartment house, townhouse, two 10 Acres
family homes, parking, agriculture
VR Single family detached dwelling, municipal use. 40,000 sq. ft.
B. Non-Residential
There
are three (3) non-residential zoning districts discussed in the Draft
NON-RESIDENTIAL ZONING SUMMARY
District Primary
Use Minimum
FPC – Floodplain District created to prevent excessive and Not
Conservation Unusual development in areas deemed applicable
(Overlay District) Undesirable for development due to inherent
Natural drainage conditions and topographical
Features.
SSC - Steep Slope District created to preserve and protect Not
Conservation those areas having steep slopes from applicable
(Overlay District) inappropriate development and excessive
grading as well as to permit and encourage
the use of said areas for open space purposes.
VCR - Village Single family detached dwelling, single 25,000 sq. ft.
Commercial/ family semi-detached dwelling, municipal
Residential use, home occupation, agriculture, professional office
personal services shop, small scale retail, (by conditional
use - conversion of a permitted residential or non -
residential use to a single family or multi-family
use, conversion of a residential use to
municipal use, office use, personal service shop,
small scale retail)
YEAR POPULATION TOTAL HOUSING UNITS
1970 1,560 N/A
1980 1,995 N/A
1990 2,216 732
2000 2,363 821
Housing Unit increase 1990-2000: 89 units
The
Montgomery County Planning Commission estimates the future population of
Year Estimated Population
2005 2,510
2010 2,700
2015 2,890
2020 3,080
2025 3,240
Within
the
Section
4.3, Land Use Designations, describes the residential and non-residential
zoning districts within
With no historical water or sewer use data from which to
project the sewage needs of these units, it is necessary to base the projection
on a default design allowance. The
standard number used, as shown in the PADEP Sewage Manual Design Guidelines, is
100 gallons per day per capita. The 2000
Census data reported 2.92 people per household for
Within the Tylersport Study Area, it is anticipated that the average daily flow (ADF) generated during the next five to ten years will be as shown below. The design hydraulic load at the plant is based on a maximum month flow (MMF) to average daily flow peaking factor of 1.25.
Projected Flow in Gallons Per Day
EDU’s ADF MMF
Existing developed properties 104 27,300 34,125
Townhouses (new) 139 31,275 39,094
Single-family (new) 32 8,400 10,500
Single-family (new) 18 4,725 5,906
Future Single-family 20 5,250 6,563
Total 313 76,950 96,188
The number of EDU’s associated with developed properties reflects an estimate of multiple EDU’s for some non-residential properties, such as the firehouse and a hotel. All residential properties are assigned one EDU.
The future allowance is recommended to account for the inevitable development of vacant lots and flag lots once the sewer line has been installed in the Tylersport area. Allowing for an additional 20 units, or approximately 20 percent of the existing EDU’s, brings the total ADF rate to 77,000 gpd.
Figure 4-1
Figure 4-2 Growth & Preservation Plan (See Hardcopy at Township Office)
Figure 4-3 Proposed
The most suitable available alternatives for disposal of wastewater in the Township are On-lot disposal, land application or stream discharge from a local or regional WWTP. Land application and stream discharge alternatives, both requiring collection systems and treatment facilities, are suitable for areas containing multiple homes or developed properties, while OLDS are best suited to individual homes.
OLDS and land application alternatives both require available areas of land with soil conditions suitable for disposal.
Traditional sewer collection systems use 8-inch or larger diameter pipelines installed so that wastewater flows by gravity. The pipes are laid in straight lines between manholes that provide access for cleaning the system as necessary.
When the topography in the area prevents the cost-effective use of gravity systems, requiring sewers to be unacceptably deep and/or requiring multiple pumping stations, low pressure or vacuum sewers can be used. These systems employ small diameter pipelines that can be laid at variable slopes and routed around obstacles such as trees. The most common system employed in this area of the country is low pressure sewers. Each property has a grinder pump installed forcing the sewage into a common force main that conveys the wastewater to the treatment facility. If the system is large enough traditional pumping stations may need to be used in conjunction with the low pressure system.
Alternatives have been selected for further evaluation in the following section, representing the most practical available options for this Planning Area. The Alternatives include various treatment and collection methods for meeting the current and future sewage needs of the area.
The demonstrated failure rate of the existing OLDS in the Study Area, along with the type of soil prevalent in the area and the small lot size of many of the existing and proposed homes, is not conducive to the implementation of an On Lot Management Program designed to maintain the use of OLDS. Similarly, the type of soil and the density of population in the study area means that land application alternatives, such as spray or drip irrigation systems, are not practical for the Tylersport Study Area. However, they will be considered for open areas in the rest of the Township, in subsequent studies. Three On-lot disposal alternatives have been evaluated as follows:
a. Small Flow Treatment Facilities to serve Individual Homes or Clusters of Homes. The prevailing soil types present in much of the area, the small lot size of many of the properties with failing systems and the number of systems that would be involved makes this alternative impractical. The cost to install an individual treatment unit would be prohibitive to many homeowners and the legal and property easement issues involved with combining clusters of existing homes into one facility would be problematic. Desirability and re-sale value of a property with a private facility that would need maintenance would be less than one with central sewers. This option is not considered viable for the Tylersport area.
b. Repair, Replacement or Upgrade of Malfunctioning OLDS. The on-going problems with failing and/or poorly maintained OLDS in the Tylersport area shows the reluctance or inability of homeowners to install a new on-lot system until the problem is chronic. The soil conditions, the lot size and the cost of alternative systems mean that the only practical solution for most properties is to install a sand mound. These systems typically cost between $15,000 and $20,000. The cost and the visual detraction to property value make them unpopular and impractical on a large scale. The option of repairing systems is appealing to those residents that currently have a functioning system, but is not a realistic solution to a community problem where there are so many actual and potentially malfunctioning systems. The Township wants to provide a permanent solution to the historic problems of the area. This alternative does not provide a comprehensive and/or guaranteed solution.
c.
There are four primary components required in a typical land application (spray irrigation) system:
· Treatment Pond
· Storage Pond
· Spray Field(s)
· Mechanical Equipment
· (Piping, Spray heads, pumps, valves, meters, controls etc.)
The first three components require land to be purchased, cleared and maintained. The third component requires a large area of land with suitable soils and without steep slopes. All components require equipment purchase, installation, maintenance and operation.
Preliminary Sizing
Requirements:
Component 1 - Treatment Pond
The system is required to provide treatment to at least secondary discharge standards. To operate effectively the treatment pond is required to hold at least 30-days of flow. For the Tylersport area only, total flow of 40,000 gpd, a 1,200,000 gallon treatment pond is required. At an average of 8 feet deep the pond would be about 0.5 acres.
If no land is available for a treatment pond a conventional package treatment plant could be installed. This would save on land costs but require higher ongoing operating costs.
Component 2 – Storage Pond
Wastewater cannot be applied to frozen ground. In this region that typically restricts spray operations to 9 months of the year. During the other 3 months the wastewater is put into a storage pond. For the Tylersport area only, total flow of 40,000 gpd, a 3,600,000 gallon treatment pond is required. At an average of 8 feet deep the pond would be about 1.5 acres.
Component 3 - Spray Fields
Depending on the suitability of the soil (if any is available), the allowable rate at which wastewater can be applied to the ground is typically between 1,000 and 4,000 gallons per day per acre (gpd/ac). Each spray field requires a buffer zone, typically 100 feet wide, around it. The acreage required for buffer zones will be more if the spray field cannot be placed on one contiguous piece of property. For the Tylersport area only, total flow of 40,000 gpd, the spray field would be between 10 and 40 acres, the buffer zone could be between 3 and 13 acres.
The total acreage required for a 40,000 gpd spray irrigation system, based on the previous estimates, is as follows:
Application Rate
(gallons/acre/day)
Component 1,000 4,000
Treatment Pond 0.5 0.5
Storage Lagoon 1.5 1.5
Spray Field(s) 40.0 10.0
Buffer Zones 13.0 3.0
Total Acres 55.0 ac 15.0 ac
2005 Real Estate
(Data provided by Realty Executives,
1 3.24 211,000 65,123
2 5.50 300,000 54,545
3 3.89 250,000 64,267
4 1.45 140,000 96,552
5 2.63 159,000 60,456
6 2.85 66,631 23,379
7 2.44 171,250 70,184
8 2.18 171,250 78,555
9 2.50 171,250 68,000
10 3.76 185,000 49,202
11 3.02 245,000 81,126
12 13.67 280,000 20,483
Average 3.93 $61,031
Max. 13.67 $96,552
Min. 1.45 $20,483
Preliminary Capital
Cost Estimates:
Collection system $1,442,625
(Identical for any treatment
scenario, based on collection system alternatives)
15 ac @ $2,000 55 ac @ $60,000
Land Acquisition $300,000 $3,300,000
Piping - Collection System to Spray Fields 80,000 240,000
Treatment Facility (including ponds,
pump station, control building) 900,000 900,000
Clearing and Preparing Spray Fields 190,000 320,000
Valves, meters, pumps, controls etc. 200,000 300,000
Total Construction Cost $1,670,000 $5,060,000
Contingencies (20%) 274,000 352,000
Total Project Cost (
This option is far more costly than conventional conveyance and pumping to a WWTP. Combined with the lack of suitable land in the area these options are not considered viable alternatives.
The WB Homes, Rosey Ridge Partnership has prepared plans for
two developments in the southern portion of the Planning Area. The properties are adjacent to the PA
Turnpike and connect from
The plant would be sized to meet the needs of the current development only. It would remain a privately operated facility and there would be no initial cost to the Township. However, it must be recognized by any municipality that the operation, and eventual ownership, of a private plant will become the Townships responsibility if the developer or private operator defaults in their obligations.
Given the demonstrated need for an alternative to
on-lot disposal in the Tylersport area, a sanitary sewer collection system
would be installed along Route 563 and
Collection system costs have been estimated for the Township portion of the system based on either the use of low pressure sewers for the entire system, or for a combination system using low pressure and conventional gravity sewers. The proposed location and sizes of pipelines for Options 1 are shown on Figure 6-1.
Tylersport, and
The same two collection system Options for Tylersport that were described in Alternative 3 will apply to this Alternative. The proposed location and sizes of pipelines for Options 1 are shown on Figure 6-2.
Alternatives 1 and 2, as described in Sections 6.1 and 6.2, do not require any capital expense from the Township. The estimated capital costs for each of the two collection and treatment options described in Section 6.3 are shown on Tables 6-1A, & 6-1B.
The specific plant process to be used would be confirmed during the design phase of the project, to ensure that a suitably efficient, reliable and cost-effective package treatment plant system is installed. Early plans anticipated that the package plant would be designed by Purestream ES LLC, using the BESST process. A Concept Report and Construction Cost Estimates, as provided by the developer’s engineer, are contained in Appendix B. However it is recognized that modifications to that design would be required in order to meet PADEP’s revised preliminary discharge standards that were generated after the Concept Report was prepared. No updated report or detailed cost estimate has been produced because the Franconia Option (see next section) was determined to be a more cost effective solution. The revised cost estimates that have been presented are based on the assumption that the plant would be built by the developer, at his cost, to serve the needs of the two planned developments, and that the Township would provide no more than the incremental cost to cover the expansion of the plant to serve the Tylersport area.
The estimated capital costs for each of the two collection
and conveyance options described in Section 6.4 are shown on Tables 6-2A, &
6-2B. These costs assume that the
developer will construct all conveyance facilities at his cost and that the
Township will pay a tapping fee to
Initial operating and maintenance costs have been developed as shown on Table 6-3A, based on typical components required in any treatment plant, and on Table 6-3B based on typical pumping costs.
Estimated total Operating and Maintenance costs are preliminary, intended only to provide an order of magnitude. The actual cost will depend on many variables, including actual flow rates, staff available to share duties and local cost factors.
As discussed above, in Section 4.6, there is not expected to be any significant increase in the number of future EDU’s tributary to the sewer system. Therefore, future O&M costs have only been increased to include a suitable allowance for inflation.
The previously calculated capital cost and operating costs are combined to indicate the present worth of each alternative on Table 6-4. Given the level of accuracy in the preliminary cost estimates, it is clear that there is no obvious financial difference between the two collection system alternatives. However, the flexibility provided by the all low-pressure system in Option 1 provides significant advantages during construction and installation of the system. Therefore, the Analysis is based on Alternatives 3 and 4 with Option 1 in both cases.
There are essentially three alternative sources of funding open to the Township, as listed below, which may be used individually or combined, depending upon availability. Financing terms, funds availability and project schedule may influence their selection. The following table provides the estimated interest rate and terms available:
Alternative Interest
Rate Term
Bond Issue 5.5% 20 years
Bank Loan 6.0% 20 years
PENNVEST 1% to 4% 20 years
The selection of the funding source is not only driven by interest costs, but also by the financial objectives of the borrower. Given a choice, the Township may prefer the higher annual payment and a shorter loan term of a bank loan, as opposed to the lower annual payment under PENNVEST, with a longer loan period.
There are other factors that may play a role in the selection process, such as flexibility of the funding source with regard to the project schedule and financial application deadlines, as well as the availability of the funding itself.
Bond Issues and Bank Loans provide the greatest flexibility of the alternatives presented, in relation to project schedule and availability of funds. Once bonds have been issued, or a bank loan has been approved, funds are readily available to pay for project costs. On the other hand, funding from a State program, such as the PENNVEST program, can only be obtained after the conclusion of a financial assistance application process, and through project cost reimbursement requests. In addition, financial assistance applications may only be submitted to PENNVEST on specified dates during the year, which may not coincide with the overall project schedule, thereby causing unnecessary delays. As mentioned, during the construction phase of the project, funds are obtained through a cost reimbursement process; this sometimes causes the borrower to set up a line of credit to avoid cash flow problems due to delays in cost reimbursements. Finally, State funding programs allocate available monies among several applicants. Therefore, introducing a PENNVEST financial assistance application does not insure that funding will be obtained from the program.
Recognizing the above, it
is recommended that